Sign In | Join Free | My adobecards.com |
|
Brand Name : CT Steel Structure
Model Number : Warehouse 86602
Certification : SGS
Place of Origin : China
MOQ : 200 square meters
Price : $300 per square meter
Payment Terms : L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability : 200, 000 Tons / Year
Delivery Time : 5-6weeks
Packaging Details : Single package size: 1100 × 200 × 200 cm
Weight : Light Weight
Intensity : High Intensity
Apply : Easy to Apply
material : High intensity
Delivery : Customized
Waterproof : Highly
Type : H-Section Steel
Design : Customized
Name : Warehouse Steel Structure Building
Product name | Steel structure warehouse |
Length | H beam 4000-15000mm |
Height | 200-1200mm |
color | According to customers |
Base | Cement and steel fouddation bolts |
Main frame | H beam |
Roof purlin | Q235B C/Z section galvanized steel |
Wall purlin | Q235B C/Z section galvanized steel |
Bolt | Plain bolt ang high-strenth bolt |
Door | Sliding or rolling door |
Customized design is welcomed. | |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Advantages:
Sturdy and durable: The main body of the steel structure warehouse is made of hot-rolled steel and welded steel, which has high material strength and can withstand large vertical pressure and horizontal load, providing stable support for the warehouse. Maintain structural safety even when storing large quantities of heavy goods for long periods of time, greatly extend the life of the warehouse, and reduce the cost of reconstruction or overhaul due to structural damage.
Strong stability: The good toughness of steel enables it to absorb energy through its own deformation in extreme situations such as earthquakes and strong winds, avoid brittle fractures, and ensure the overall stability of the warehouse. This stability is essential for warehouses that store high-value goods or are environmentally demanding, reducing the risk of cargo loss.
Stable connection: high-strength bolts and high-quality welding materials are used for connection, friction high-strength bolts ensure the integrity of the structure, pressure-bearing high-strength bolts meet high bearing requirements, and welding process ensures connection strength. The whole connection system makes the warehouse structure form a stable whole, even in complex stress situations, it can reliably transfer the load and ensure the normal use of the warehouse.
Efficient construction: The components are prefabricated in the factory, and with the help of advanced equipment and technology, the size can be accurately controlled, the on-site installation error can be reduced, and the construction quality can be guaranteed. At the same time, the factory prefabrication with on-site rapid installation, greatly shortening the construction period, compared with the traditional warehouse construction, can be put into operation faster, save time and cost, so that enterprises can quickly carry out warehousing business, seize market opportunities.
Why Choose Us
Our design team consists of experienced structural engineers and architects who engage with clients from the very beginning of a project. We will not only understand the basic needs of the customer for building functions and space layout, but also further discuss the special requirements of the project, such as special considerations for lighting and ventilation, as well as possible future functional expansion directions. Through detailed research, the design team can accurately grasp the design direction and provide a comprehensive basis for subsequent design.
In the process of steel structure processing and production, advanced equipment and refined processing technology are adopted. CNC cutting equipment can accurately control the cutting size, and the error is controlled within a very small range; Automatic welding equipment improves welding efficiency and quality, and ensures that the weld is uniform and firm. For key processes, such as thick plate welding, complex node production, etc., experienced skilled workers are arranged to operate, and the whole process of quality control is carried out.
Before transportation, the steel structural components are packed with a full range of protection. Use corner protection, stretch film and other materials to protect the corners and surfaces of the components to prevent collisions and scratches during transportation. When the vehicle is loaded, the components are reasonably placed, and reinforcement measures such as support and bundling are adopted to ensure that the components do not displace or dump during transportation. For extra-long, ultra-wide and ultra-high components, obvious warning signs will also be set up to ensure transportation safety.
Choosing our steel structure storage products is to choose professionalism, quality, efficiency and value. We look forward to working with you to create exceptional construction projects.
Company Profile
Shandong Chentai Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!
Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
FAQ
![]() |
Cold Storage Warehouse Steel Structure Building Construction Metal Panel Insulated Images |